Zone
Printed as ZONE
Where on the sheet the change was made: the grid square from the border's letters and numbers, such as B3, or several when the change touches several places.
The revision history block, usually in the upper right corner of an engineering drawing, records every change made to the drawing after its release: the revision letter, what changed, the date and who approved it, often with the zone where the change was made and the change order that authorized it. The current revision is the one furthest along the letter sequence, and it should match the REV box in the title block.
Last updated
The block
One row a revision, under a heading of REVISIONS, usually in the upper right corner of the sheet. ASME Y14.35 requires every change after release to be recorded here, in the format ASME Y14.1 lays out.
Printed as ZONE
Where on the sheet the change was made: the grid square from the border's letters and numbers, such as B3, or several when the change touches several places.
Printed as REV LTR SYM
The revision's letter. Older drawings head the column LTR (letter) or SYM (symbol).
Printed as DESCRIPTION
What changed, in enough detail to find it and to see what it was before: HOLE DIA .250 WAS .228, ADDED NOTE 5. When one revision makes several changes, each may be numbered in parentheses, (1), (2), as ASME Y14.35 allows. The description often ends with the number of the change order that authorized it.
Printed as DATE
When the revision was approved. The title block's dates belong to the original release; each later revision is dated only here.
Printed as APPROVED APVD APPD
Who approved the revision, by name or initials. Some blocks add a column for each approval the company needs.
Sources: ASME Y14.35 (recording revisions in the revision history block; numbering several changes), ASME Y14.1 (the block's format).
Revision letters
Capital letters in sequence from A, leaving out I, O, Q, S, X and Z, which are easily mistaken for numerals and other marks.
Under ASME Y14.35 a drawing's revisions run through twenty single letters:
ABCDEFGHJKLMNPRTUVWYAfter Y come AA, AB and so on to AY, then BA to BY, skipping the same letters. A revision is never more than two characters.
The first release needs no letter. It may show a dash in the REV box, and A is then the first change after release. Some companies release at A instead, so the first row of the revision block shows which scheme a drawing follows.
Not every drawing follows the rule. Older drawings, and some companies' own schemes, use the skipped letters (I, O, Q, S, X, Z), so a revision S is not necessarily a misprint. Others number their revisions, 1, 2, 3 or 01, 02.
Source: ASME Y14.35 (revision letters, the first release, two characters at most).
Finding the change
ASME Y14.35 asks that the place of every change be identifiable, in one or more of four ways.
Zones are read like a map's grid: B3 is the square in row B and column 3. How a sheet's zones are laid out is on drawing sheet sizes.
Source: ASME Y14.35 (identifying where a revision was made).
Change paperwork
Every revision is authorized by a change document, and the revision block names it, so the drawing can be traced to the decision behind each change.
Companies use these names differently, and many use only one of them. What matters on the drawing is the number: it ties the revision to the paperwork that says why it was made. All the changes one change document authorizes go into the drawing at the same time, under one revision letter.
Sources: ASME Y14.35 (the authorizing document in the revision block; one document's changes under one letter); the abbreviations as ASME Y14.38 lists them.
The current revision
Read the letters, not the row: the current revision is the one furthest along the sequence, and two places on the drawing should agree on it.
Redrawn and replaced drawings. A drawing redrawn with changes moves to the next letter; one redrawn without change, to replace a lost or worn original, need not. A drawing replaced by one with a different number says so in its revision block, naming the drawing that replaces it.
Source: ASME Y14.35 (revision control on multi-sheet drawings, redrawn and superseded drawings).
Variants
A dash number names a different part; a revision is a new version of the same drawing.
Dash numbers let one drawing define several variants, such as a part in three lengths: each is the drawing number with a suffix, 10045-1, 10045-2, 10045-3, and each is a part number of its own. A drawing that lists its variants in a table this way is a tabulated drawing.
A revision belongs to the drawing, so every dash number on it shares the drawing's revision, and the revision is not part of the part number: under ASME Y14.100 a part number never includes the drawing's revision. Part 10045-2 is ordered as 10045-2; the revision says which version of the drawing defines it.
When a change needs a new part number. If a change leaves the part interchangeable with the old one, in form, fit and function, a new revision is enough. If it does not, ASME Y14.100 calls for a new part number, and the assemblies that use the part change part number too, up to the level where interchangeability is restored.
Source: ASME Y14.100 (part or identifying numbers, and changes that need a new one).
Questions
ASME Y14.35 leaves out I, O, Q, S, X and Z, so the single letters run A, B, C, D, E, F, G, H, J, K, L, M, N, P, R, T, U, V, W and Y. Older drawings and some house schemes do use the skipped letters.
AA, then AB and so on to AY, then BA to BY, skipping the same letters. Under ASME Y14.35 a revision is never more than two characters.
Not necessarily. Under ASME Y14.35 the first release needs no revision letter and may show a dash, so A is the first change after it. Some companies release at A instead; the first row of the revision block shows which a drawing does.
On the print, the REV box in the title block and the revision block's entry furthest along the letter sequence should agree. Whether that revision is still current is a question for the company's document control, since a print shows only the revision it was printed at.
Both are change documents. An engineering change order (ECO) usually authorizes and directs a change; an engineering change notice (ECN) usually records or announces it; a request (ECR) asks for one. Companies use the names differently, so what matters on the drawing is the number that traces each revision to its paperwork.
When the changed part is no longer interchangeable with the old one in form, fit or function. ASME Y14.100 then calls for a new part number, not just a new revision, and the assemblies that use it change part number too, up to the level where interchangeability is restored.
From SpecCapture
SpecCapture reads the title block, the revision history, the bill of materials, the hole table, the application block, the tabulated dash numbers and the general notes off 2D engineering drawings, with a box on the drawing around every value it reads, so checking it takes a glance.
SpecCapture reads every row of a drawing's revision history (revision, description, date and approved by) and exports the rows to the Revision History tab of an Excel workbook, to revisionHistory.csv in the CSV download, or to JSON. Each row starts with the sheet it came from and its row number, each value sits beside its review state and confidence, and each uploaded file exports on its own.